Why Bill Mosher Stepped Down
Bill Mosher stepped down after concluding that his one-year commitment to Mayor Mike Johnston was becoming an open-ended, full-time assignment with mounting pressure.
What began as a special-projects, consultative role expanded into high-stakes work tied to downtown revival and Burnham Yard-related efforts. Burnham Yard, a historic 320-acre site now central to plans for a new Broncos stadium, added to the scale and complexity of the work. That shift made the position feel far less temporary and pushed it beyond the boundaries he had expected. He also said he chose to leave before the upcoming mayoral re-election campaign, viewing political timing as another reason not to remain in the role indefinitely.
Personal and Workload Pressures
Mosher described the city job as one of the most stressful of his career, requiring constant engagement and testing his stress limits.
After roughly 50 years in urban redevelopment, he said family priorities carried greater weight, including time with his wife, family, and grandkids.
He did not frame the decision as retirement from civic service. Instead, it reflected a desire to keep contributing to Denver selectively, with more flexibility and less than full-time demands.
Who Leads Downtown Denver Now
With Mosher stepping away, Downtown Denver’s leadership is now split between the Downtown Denver Partnership and City Hall.
Partnership leadership is centered on Kourtny Garrett, the group’s president and CEO. Board Chair Amy Hansen provides strategic oversight through the 2026 board.
Garrett is the clearest public-facing downtown leader on the civic and business side. David Welsh, Sharon Alton, and other senior executives support economic development and strategic alignment.
The board structure points to distributed leadership, not a single successor.
Bellevue’s recent office sale underscores how major urban real estate markets are balancing commercial investment with new residential development.
City Hall Takes Project Control
City coordination runs through Mayor Mike Johnston, who remains the top municipal figure tied to downtown revival and major projects.
Jen Welborn is positioned to absorb Mosher’s project duties. Chief of Staff Jenn Ridder is supporting the changeover while approved projects move forward.
Why Downtown Denver Recovery Remains Fragile
Downtown Denver continues to recover unevenly, and the numbers show a core that remains well below pre-pandemic strength.
Foot traffic has been reported at 67 percent of 2019 levels, while one mobile phone analysis placed activity at 56 percent of pre-COVID norms.
Weekends have improved more than weekdays, yet downtown still trails many peer city centers.
Vacancy and Perception Risks
Office vacancy remains a major drag on daytime demand, with reported rates ranging from 24 percent in 2023 to near 37 percent of 2025.
Remote and hybrid work continue to reduce spending at nearby shops, restaurants, and transit.
Crime and homelessness also weigh on perceptions, especially where property-crime concerns discourage visits and tenant confidence.
Fragile Street-Level Economy
That leaves retail, cultural programming, and transit enhancement dependent on a thinner, less reliable customer base.
How Denver Will Fund Downtown Revival
Through an expanded Downtown Development Authority approved by voters in 2024, Denver’s revival strategy is centered on roughly $570 million in tax increment financing for downtown projects.
The model redirects future downtown property and sales tax growth into redevelopment, avoiding new tax rates or direct pressure on the city budget.
Capital Pipeline Takes Shape
Applications opened in 2025 for developers, artists, businesses, and agencies.
Phased rounds and rolling review are designed to create a decade-long pipeline.
- Housing, parks, infrastructure, and business redevelopment are eligible.
- Some projects can receive up to 20% of total costs.
- Early approvals included $100 million for catalytic investments.
Officials are deploying creative financing through loans, annual tax increment payments, and milestone-based awards.
That structure is intended to lower risk, support adaptive reuse, and attract larger private investment into struggling downtown blocks.
What Denver Must Deliver Next
Although visitation climbed close to pre-2019 levels during several 2026 periods, Denver’s next test is whether city leaders can turn event-driven momentum into a downtown that feels consistently safe, accessible, and active on ordinary days.
Safety and Street Order
That means stronger public safety measures, visible order, and coordinated street management during both major events and routine weekdays.
Leaders have treated safety as essential to restoring confidence and sustaining repeat visits.
Access and Daily Demand
Reliable transit access is also central as RTD expands service during large events and downtown manages closures, traffic, and pedestrian flows.
Foot traffic reached 94% of January 2019 levels in January 2026 and 95% in April, but office vacancy remained near 29%.
Jobs, Retail, and Occupancy
The next phase requires converting activity into lasting office occupancy, retail strength, and daily destination appeal.
Assessment
Mosher’s exit removes a prominent figure from Denver’s downtown recovery effort at a sensitive moment.
The city now faces a credibility test as leaders try to stabilize office demand, street activity, public safety, and investment momentum.
Available funding and institutional support may keep key projects moving, but the recovery remains uneven and exposed to broader economic pressure.
What happens next will depend less on vision than on execution, measurable results, and the city’s ability to sustain confidence.





















